Industrial Pipe Fabrication,Piping Fabrication,Industrial Piping Systems,Pipe Fabrication Systems,Piping Fabrication Systems,India pre fabricated piping system, pre fabricated piping systems, pre fabricated piping fabrication,india Home Query Contact Us Site Map  
An ISO 9001:2008 Company
Engineering
Quality Assurance
Quality Equipment
Clientele
Certification
What's New
Feedback
Business Enquiry
Client Login  
DEE Development Engineers Pvt. Ltd. » Fabrication » Welding

In Welding currently available procedures are :

» GTAW
» Orbital GTAW
» GMAW
» SAW
» MCAW
» FCAW
» Orbital FCAW
» SMAW


The welders are trained for procedures and certified to standards at the dedicated in house Center for Welder Training.

The tests for qualification of welding procedures are undertaken at the in house Mechanical testing Laboratory which is also equipped with Metallographic capabilities.

Procedure qualification records include materials like P91, P22, P11, SS304, SS316, SS321 etc.

In House Heat Treatment facility includes a Gas Fired Boogie Furnace as well as Electrical Mobile Units.

Mechanical Test Laboratory

» 300 Joules Charpy Impact Testing Equipment Calibrated as per BS EN 10045 (Part II).
» 200 KN capacity Universal Testing Equipment for Tensile and Bending Tests Calibrated
   as per IS 1828 (Part I) Identical with ISO 7500-1: 1986 and ASTM E4.
» Hardness Tester calibrated as per IS:1586-2000.
» Spectrometer for positive material identification of WAS make.
» X-Ray Fluorescene Analyzer.
» MPI Testing Equipment.
» Ultrasonic Testing Equipments.

Heat Treatment

» One Car Bottom Gas Fired Boogie Hearth Furnace Max Temp 1000°C.
» 2mW x 2mH x 6mL, 25 cum Volume, Programmable, Fully Automatic Control, 3 Point
   Recorder.
» 10 Electrically Powered Mobile Heat Treatment Units for Shop & Site Applications.

   Home :: Query :: Contact Us :: Site Map
  Copyrights © 2006-2007 All rights reserved, Dee Development Engineers Pvt. Ltd. Website Design & Innovation by: Futuristic Software Consultancy